Swimming Pool Installation Checklist

View original document →

Overview

This document outlines the requirements for obtaining a building permit and scheduling inspections for swimming pools, spas, and hot tubs in Altoona, PA. It applies to both in-ground and above-ground pools, as well as any spa or hot tub containing water over 24 inches deep.

Submission Requirements

Before submitting an application, you must have a "checkmark" in all sections of the following checklist:

  • Site Plan: Must show the proposed pool, hot tub, or spa location and include distances in feet to the front, sides, and rear property lines.
  • Construction Documents: Three (3) complete sets of documents showing code compliance are required. These must include:
    • Safety Barrier: Details on the type (fence, walls, etc. ) and height.
    • Decking: If a deck is being installed, submittal requirements for the deck must also be included.
    • Electrical Service: Location and wiring method for pumps, filters, and receptacles.
    • Application: A completed building permit application.

Note: If minimum requirements are not met, the applicant will be asked to supply additional information. Once approved, fees must be paid before picking up the permit at City Hall.

Inspection Procedures

  • Permit Posting: The building permit must be posted on-site and visible from the road until the project is complete.
  • Plan Availability: Approved plans must be available at all times for inspection.
  • Scheduling: The permit applicant or authorized agent is responsible for scheduling all inspections.
  • Readiness: Do not schedule an inspection unless the work is ready.
  • Permit Number: You must supply your permit number when scheduling an inspection.

Notice Requirement: Please give three (3) working days' advance notice for inspections. Footing inspections are given priority.

Inspection Checklist by Phase

The following inspections are required for all pools:

  1. Electrical Inspection:
    • Bonding of all metal parts (rebar, ladders, etc. ) prior to placing concrete.
    • Underground wiring inspection prior to covering.
  2. Deck Inspection: If installing a deck around or next to the pool, use the inspection procedure for decks.
  3. Safety Barrier Inspection: Must be done prior to filling the pool with water.
  4. Final Electrical Inspection.
  5. Final Inspection: Occurs when the job is completely finished, prior to the occupancy permit and after the electrical inspection.

Important Reminders

  • Before Digging: Call 811.
  • Questions: Contact the City Codes and Inspections Office at (814) 949-2406.