Worksheet - Farmlands Protection (CEST and EA)
View original document →
Farmlands Protection Compliance
The project has been determined to be in compliance with the Farmland Protection Policy Act (FPPA).
- Determination: No compliance or mitigation is required.
- Reasoning: The project activities do not involve new construction, acquisition of undeveloped land, or conversion that would change agricultural land to non-agricultural use.
- Scope: Rehabilitation work is restricted to the existing footprint of structures.
Floodplain Management Compliance
The project is located within a 100-year floodplain (A Zone) and requires adherence to the 8-Step Process.
- Floodplain Status: The site is located in a 100-year floodplain.
- Action Required: The project must follow the 8-Step Process for floodplain management.
- Regulations: Compliance is required under Executive Order 11988 and 24 CFR Part 55.
Correspondence regarding Williamsburg MOA
An email exchange between Andrea MacDonald (PA State Historic Preservation Office) and Pamela Reilly regarding a Memorandum of Agreement (MOA).
- Date: August 16, 2021
- Subject: Williamsburg - MOA
- Action: Andrea MacDonald signed the attached agreement to address an adverse effect on the Williamsburg Historic District.
- Next Steps: The executed agreement was to be added to PASHARE (Pennsylvania State Historic Preservation Office Environmental Review system).