Documents

Environmental Review Record - Piney Creek/Ridge Road & Fayetown Water Lateral Installation Project

View original document →

Document Overview

This document is the cover page and table of contents for an Environmental Review Record regarding a water infrastructure project in Blair County, Pennsylvania. It outlines the administrative and environmental compliance steps taken for a grant-funded initiative to install water laterals.

Project Details

  • Project Name: Piney Creek/Ridge Road & Fayetown Water Lateral Installation Project
  • Location: Woodbury Township, Blair County
  • Grant Number: CDBG FY2018 C000071558
  • Program: Community Development Block Grant (CDBG)

Document Structure & Contents

The record is organized into five main parts, covering the authorization of funds, citizen participation, project description, environmental assessment, and final determinations.

Authorization & Citizen Participation

  • Funds: Includes a Request for Release of Funds (RROF).
  • Public Notice: Documents proof of public notification, including a Concurrent Notice (FONSI/RROF).
  • Findings: Contains the Finding of No Significant Impact (FONSI) and the Request for Release of Funds.

Project Description

  • Activity Description: Referenced as form DCED-CDBG-007 (11-06).
  • Visuals: Includes a location map and documentation of current conditions (pictures).

Environmental Assessment

This section details compliance with federal regulations (24 CFR 50. 4, 58. 5, and 58. 6).

  • Compliance: Includes HUD worksheets and an Environmental Assessment Checklist.
  • Mitigation: Lists mitigation measures and conditions required by 40 CFR 1505. 2 (c).

Consultation & Determination

  • Consultation: Records input from Local, State, and Federal Agencies, as well as a DEP PACT Review.
  • Floodplain: Includes an 8-Step Floodplain Review and Decision-Making Process.
  • Special Studies: A section for miscellaneous documentation is included in Part 5.
← Back to Documents